Rubidium Atomic Frequency Standard

SKU: RAFS

Space Qualified Atomic Clock by Airbus (1 more product)

Note : Your request will be directed to Airbus.

RAFS Image

The RAFS from Airbus is a Space Qualified Atomic Clock with Mass 3.3 Kg, Supply Voltage 26 to 48.5 V (adaptable), 50 V (regulated), Operating Temperature -5 to 10 Degree C, Storage Temperature -25 to 70 Degree C. More details for RAFS can be seen below.

Product Specifications

Product Details

  • Part Number
    RAFS
  • Manufacturer
    Airbus
  • Description
    Rubidium Atomic Frequency Standard

General Parameters

  • Mass
    3.3 Kg
  • Frequency Drift
    5·10-14
  • Frequency Stability
    5·10-12, 1.5·10-12, 5·10-13, 1.5·10-13, 5·10-14
  • Supply Voltage
    26 to 48.5 V (adaptable), 50 V (regulated)
  • Operating Temperature
    -5 to 10 Degree C
  • Storage Temperature
    -25 to 70 Degree C
  • Connector
    SMA, DSUB
  • Application
    Giove A & Giove B, Galileo, ISRO (Indian regional navigation satellite system), Navigation payloads (global or regional), High-performance communications systems, Scientific applications, GNSS overlay systems
  • Dimension
    210 x 106 x 107 mm

Technical Documents

Space Missions - A list of all Space Missions

esa

Name Date
Altius 01 May, 2025
AWS 01 Mar, 2024
Eutelsat Quantum 30 Jul, 2021
Sentinel 6 21 Nov, 2020
Cheops 18 Dec, 2019
EDRS 06 Aug, 2019
Small Geostationary Satellite 17 Nov, 2018
BepiColombo 20 Oct, 2018
Aeolus 22 Aug, 2018
Sentinel 3B 25 Apr, 2018

isro

Name Date
EOS-2 07 Aug, 2022
EOS-4 14 Feb, 2022
EOS-3 12 Aug, 2021
EOS-1 07 Nov, 2020
RISAT-2BR1 11 Dec, 2019
Cartosat-3 27 Nov, 2019
Chandrayaan II 06 Sep, 2019
RISAT-2B 22 May, 2019
Resourcesat-2A 07 Dec, 2016
AstroSat 28 Sep, 2015

nasa

Name Date
NEO Surveyor 01 Jun, 2028
Libera 01 Dec, 2027
Europa Clipper 10 Oct, 2024
SpaceX CRS-29 09 Nov, 2023
Psyche 13 Oct, 2023
DSOC 13 Oct, 2023
Psyche Asteroid 05 Oct, 2023
Expedition 70 27 Sep, 2023
SpaceX Crew-7 25 Aug, 2023
STARLING 18 Jul, 2023