Rocket Lab Awarded a Contract to Provide Separation Systems for SDA's Tranche 1 Transport Layer Satellites

Rocket Lab Awarded a Contract to Provide Separation Systems for SDA's Tranche 1 Transport Layer Satellites

Rocket Lab USA, a launch and space systems company, has been awarded two contracts worth a total of $14 million to provide satellite separation systems for Space Development Agency’s (SDA) Tranche 1 Transport Layer (T1TL) satellites. Rocket Lab will supply more than 80 total Lightband Separation Systems (also called Lightbands) to prime contractor Lockheed Martin and another undisclosed customer, both of whom are manufacturing satellites for the SDA’s Tranche 1 Transport Layer.

Lightbands are separation systems that are used to attach satellites to rockets and release them into space once the rocket reaches its intended orbit. Rocket Lab’s separation systems were designed by Planetary Systems Corp, which was acquired by the Company in 2021, and have a 100% mission success rate across more than 140 missions. Compared to typical clamp band separation systems, Rocket Lab’s Lightbands are lighter weight, have a lower profile, shock, and tip-off rate, and have attained the highest Technology Readiness Level by the US Government.

Part of the National Defense Space Architecture (NDSA), SDA’s Transport Layer will provide assured, resilient, low-latency military data and connectivity worldwide to the full range of warfighter platforms. T1TL consists of a mesh network of 126 optically-interconnected space vehicles and will form the initial warfighting capability tranche of the NDSA.

“The Tranche 1 Transport Layer will provide crucial capabilities for the National Defense Space Architecture and we’re proud to be delivering the separation systems that will deploy these spacecraft precisely and accurately,” said Brad Clevenger, Vice President of Space Systems. “Being selected by not one but two companies building spacecraft for the SDA’s Transport Layer is a real vote of confidence in our Lightbands which have delivered 100% mission success for more than 100 separations on orbit.” 

Previously, Rocket Lab’s Lightbands have been used on NASA International Space Station and Space Shuttle missions, on all major U.S. and international rockets.

The Lightbands are a part of Rocket Lab’s vertically-integrated Space Systems offering that also includes the in-house manufactured and operated spacecraft, satellite dispensers, and satellite components such as reaction wheels and star trackers, solar panels, and flight software.

Click here to view various satellite separation systems from the leading manufacturers listed on SATNow.


Publisher: SatNow

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013