Firefly Aerospace Secures DoD Contract for Elytra Space Maneuver Mission in 2027

Firefly Aerospace Secures DoD Contract for Elytra Space Maneuver Mission in 2027

Firefly Aerospace, the leader in end-to-end responsive space services, announced it was awarded a contract to perform a responsive on-orbit mission with its Elytra spacecraft in support of the U.S. Department of Defense’s (DoD) Defense Innovation Unit (DIU) Sinequone Project. During the DoD mission, Elytra will serve as a space maneuver vehicle to perform a series of responsive on-orbit tasks, including space domain awareness operations in low Earth orbit (LEO). The mission is set to launch as early as 2027.

Firefly has proven our ability to rapidly and reliably launch, land, and operate in space as we continue to execute bold missions from LEO to lunar orbit and beyond,” said Jason Kim, CEO of Firefly Aerospace. “This national security mission will further demonstrate our ability to perform responsive on-orbit tasks when and where our customers need them with our highly maneuverable Elytra orbital vehicle. To achieve this, we equipped Elytra with many of the same flight-proven systems Firefly utilized to successfully land on the Moon after traveling 2.8 million miles across cislunar space.”

As part of the mission, Elytra will host a suite of government payloads, including optical, visible, and infrared cameras, a responsive navigation unit, and a universal electrical bus with a payload interface module. Firefly’s Elytra Dawn configuration will utilize common components from the company’s launch vehicles and lunar landers, including the avionics, composite structures, and propulsion systems, to enable on-demand mobility, plane changes, and maneuvers with high delta-V capabilities and reliability. Elytra’s main engine, called Spectre, was recently flight-proven on Firefly’s Blue Ghost lunar lander as the reaction control system thrusters that successfully performed Firefly’s final descent on the Moon on March 2.

The DoD contract supports the DIU’s Sinequone project that aims to deliver cost-effective, responsive access beyond Geosynchronous orbits, referred to as xGEO. This mission in LEO is the first step to enable future access and operations in xGEO on a responsive timeline. The award follows Firefly’s initial trade studies that were completed for the DIU in 2024.

As demand for responsive on-orbit services continues to grow, Firefly is expanding its spacecraft production capabilities and was recently awarded an $8.2 million grant from the Texas Space Commission to add additional spacecraft clean room space, test facilities, and infrastructure. This will allow Firefly to mass produce Elytra in higher quantities at a lower cost in support of long-haul communications relays, on-orbit payload hosting, maneuverability, and other responsive services across cislunar space.

Click here to know more about Firefly Aerospace's Upcoming Missions

Publisher: SatNow

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013
Advertisement