Redwire Delivers Onboard Computer for ESA’s Comet Interceptor Mission

Redwire Delivers Onboard Computer for ESA’s Comet Interceptor Mission

Redwire Corporation, a leader in space infrastructure for the next-generation space economy, announced that it has successfully delivered the onboard computer for the European Space Agency’s (ESA) Comet Interceptor mission. Redwire developed and delivered the onboard computer through a contract with OHB Italia S.p.A. (OHB Italy). ESA’s Comet Interceptor will be the first spacecraft to visit a comet coming directly from the outer reaches of the Sun, carrying material untouched since the dawn of the Solar System.

Redwire’s wholly owned Belgian subsidiary, Redwire Space NV, developed the onboard computer, which is the “brain” of Comet Interceptor. It is designed to monitor and control other spacecraft components, including transmitting critical data to operators on the ground. The onboard computer is part of Redwire’s third-generation Advanced Data and Power Management System (ADPMS-3).

“We are proud to have accomplished this exciting milestone alongside our partners OHB Italy and ESA, which brings the first-of-its-kind Comet Interceptor mission one step closer to launch,” said Mike Gold, Redwire President of Civil and International Space Business. “With 25 years of flight heritage, a strong track record of success, and the Redwire team’s unparalleled avionics expertise, Redwire’s ADPMS-3 is a critical, enabling technology for today’s most ambitious European and multinational space missions.”

The recent delivery follows an acceptance testing campaign, which included vibration, thermal vacuum, and electromagnetic compatibility testing. The onboard computer is currently at OHB Italia headquarters, where it will undergo integration and final acceptance review. Comet Interceptor is scheduled to launch in 2029. The onboard computer is also supporting ESA’s Hera mission, Europe’s first planetary defense mission, and part of a multinational planetary defense effort supporting ESA’s Double Asteroid Redirection Test mission.

Redwire’s European facility in Belgium has more than 40 years of spaceflight heritage, developing spacecraft platforms and successfully delivering innovative technology for game-changing ESA programs. Redwire was the prime contractor for ESA’s Proba-1, Proba-2, and Proba-V missions, which have a combined flight time of 50 years without failure. Redwire continues to support other ESA programs, including Skimsat, a technology demonstrator for a small satellite platform designed to operate in very low Earth orbit; the International Berthing and Docking Mechanism for the lunar Gateway; and the Proba-3 mission, the first precision formation flying mission that will investigate the Sun’s corona.

Click here to learn more about Satellite On-Board Computers (OBC) listed on SATNow

Publisher: SatNow

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013
Advertisement