Sierra Space Announces Opening of New Power Station Technology Center

Sierra Space Announces Opening of New Power Station Technology Center

Sierra Space, a leading commercial space company and defense tech prime that is building a platform in space to benefit and protect life on Earth, announced a technology center expansion aimed at scaling up the production and delivery of the company’s groundbreaking Surface Mount Technology (SMT) solar power systems, including production for national defense applications.

Earlier this month, Sierra Space announced a new operation dedicated to supporting the national security space as a prime contractor — Sierra Space Defense — as well as unveiled their “Victory Works” manufacturing facility for defense satellites.

Sierra Space’s Power Station is a brand-new production facility that will house world-class manufacturing capabilities to produce Surface Mount Technology (SMT) defense-hardened solar arrays, which provide best-in-class power density, resiliency, and production lead times. Located in Broomfield, Colorado, the Power Station spans approximately 70,000 square feet, including office space. See photos here.

In addition to the SMT production lines, the $45 million facility also houses new tooling and an integrated test center that includes thermal vacuum/thermal air chambers and a dynamics lab for vibration and pyroshock testing. These solar arrays have diverse applications, including for use on satellites.

“Sierra Space is re-industrializing the space-defense technology sector,” said Sierra Space Vice President Erik Daehler. “We have the ability to build a solar panel a day, and a wing a week. We plan to deliver 40 satellite wings in the first phase of production and are scaling up to 100 satellite wings per year by our full rate of production. Additionally, because of our unique architecture, our solar arrays are more resilient. The Power Station is a proof point in our dedication to support national security.”

With a multikilowatt solar production capacity, Sierra Space is poised to disrupt the space industry with its innovative approach to high-volume, quick-turn automation and advancements in solar array production. The new factory will also create employment opportunities. Currently, over 100 Sierra Space team members are working onsite at the Power Station.

Solar power is critical for space missions as it provides a reliable, renewable energy source to support long-duration operations in orbit and beyond. Sierra Space offers low-cost, highly scalable power systems with ranges from 10 watts to 10 kilowatts, and its end-to-end electric power solutions consist of fully assembled and tested solar arrays, solar array drives, slip rings, hinges, hold-down mechanisms, and motor control electronics.

“Using state-of-the-art tools and integration equipment, our engineering and production teams have the expertise and experience to define, analyze, build, and test complete solar array systems,” said Brian Anthony, Vice President of Spacecraft Systems at Sierra Space. “Our scalable power systems can be tailored to fit a wide variety of mission options with reduced cycle time and risk by incorporating existing qualified and flight-proven designs. With this new production facility coming online, Sierra Space is ready to meet the needs of the rapidly emerging satellite constellation market and deliver space power at lightning speed.”

Sierra Space has pioneered SMT solar cells attached to Printed Circuit Boards (PCBs) that are assembled using standard commercial electronics pick-and-place technology. These high-efficiency multi-junction MWT (Metallized Wrap Through) “micro-cells” are robotically placed onto engineered printed circuit boards, enabling automated production, higher power densities, and shorter lead times for deployable solar arrays. This development addresses the needs of both small- and large-scale deployable missions while reducing lead times for Sierra Space customers and offering significant system advantages over conventional solar panels and arrays.

In celebrating 35 years of supplying high-end, engineered subsystems and components for the space industry, Sierra Space continues to make critical progress that ensures the efficient and cost-effective utilization of high-density power in its missions.

Click here to learn more about the Wide Range of Solar Array Drive Mechanisms

Publisher: SatNow

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013
Advertisement