Amentum Supports NASA Artemis II with Successful SLS and Orion Rollout at Kennedy Space Center

Amentum Supports NASA Artemis II with Successful SLS and Orion Rollout at Kennedy Space Center

Amentum led a major milestone for NASA’s Artemis II mission with the successful rollout of the Space Launch System (SLS) rocket and Orion spacecraft from the Vehicle Assembly Building (VAB) to Launch Complex 39B (LC-39B) at Kennedy Space Center. The rollout marks a key step in final preparations for the crewed Artemis launch. During the mission, the Orion crew capsule will carry four astronauts on an approximately 10-day journey around the Moon and back. It will be propelled by the SLS, the most powerful and capable rocket NASA has ever built.

“The successful rollout and preparation of Artemis II is a clear reminder of the responsibility entrusted to our team,” said Mark Walter, president of Amentum’s Engineering & Technology business. “Amentum delivered the engineering expertise and operational discipline that made this milestone possible, ensuring Artemis II’s progress towards launch preparations and advancing our nation’s human space exploration mission.”

During rollout operations, Amentum engineers and technicians played a central role in operating the crawler-transporter, the massive transporter used to move the mobile launch platform with the fully stacked SLS and Orion from the VAB to LC-39B. The multi-hour journey required precise coordination, continuous systems monitoring, and close integration with multiple teams to safely transport NASA’s most powerful rocket.

Under NASA’s Exploration Ground Systems (EGS) program, Amentum is providing engineering, technicians, and systems integration for Artemis II. Amentum is responsible for maintaining and modernizing ground equipment, integrating and testing launch vehicles, and supporting launch, recovery, and overall operations for Orion and the SLS.

The crawler-transporter is a cornerstone of NASA’s ground infrastructure, designed to carry the SLS and Orion over several miles, including up a slope to the pad surface, at a carefully controlled pace and with extreme precision. Amentum’s role in operating and sustaining the crawler reflects decades of experience in high-consequence ground operations and mission-critical systems at Kennedy Space Center.

Artemis II is scheduled to launch early this year. With the successful rollout, NASA and Amentum have moved to the next major phase of this critical mission, including pad integration activities, final checkouts, and launch readiness activities.

Click here to know more about NASA's Artemis ll mission

Publisher: SatNow
Tags:-  LaunchGround

NASA

  • Country: United States
More news from NASA

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013
Advertisement