Voyager Technologies Secures $16.5 Million DARPA Contract for Rocket Motor Control

Voyager Technologies Secures $16.5 Million DARPA Contract for Rocket Motor Control

Voyager Technologies was awarded a DARPA Burn n’ Go Phase 2 contract, valued at $16.5 million, to advance the development of a new propellant-embedded control technology that gives solid rocket motors (SRMs) tailorable, post-manufacturing thrust control that enables improved performance and manufacturing efficiency.

“This award reflects confidence in our ability to translate advanced propulsion technologies into field-ready capabilities that support U.S. national readiness and deterrence,” said Matt Magaña, president, Space, Defense & National Security, Voyager. “Our approach is designed not only to demonstrate performance gains at the system level, but to establish a credible path to industrialization that can reshape how solid rocket motors are produced, mission-tailored and controlled.”

The award follows the successful completion of Phase 1, during which Voyager developed a conceptual system architecture and conducted detailed trade studies and preliminary designs to assess the viability and feasibility of the proposed technology. Phase 1 concluded with a Conceptual Design Review, validating the technical approach and positioning the program for hardware demonstration and manufacturing maturation.

During the 20-month contract, Voyager will combine its expertise with complex system modeling and controls with the propellant and manufacturing specialized to develop and validate proof-of-concept systems, culminating in tailorable SRM hot-fire demonstrations.

The program also focuses on manufacturing scalability and post-manufacturing control architectures, including the integration of structural health monitoring systems to support real-time health monitoring and performance. These activities are intended to prepare the technology for rapid industrial transition across multiple weapon systems, enabling flexible weapons procurement and large-scale production and stockpiling.

Voyager’s vertically integrated capability spanning advanced propulsion modeling, embedded control architectures, energetics formulation, precision manufacturing and high-consequence testing allows the company to move emerging propulsion technologies efficiently from concept through demonstration toward fieldable, industrial-scale solutions.

Click here to know more about Voyager's Space Products and Services

Publisher: SatNow

GNSS Constellations - A list of all GNSS satellites by constellations

beidou

Satellite NameOrbit Date
BeiDou-3 G4Geostationary Orbit (GEO)17 May, 2023
BeiDou-3 G2Geostationary Orbit (GEO)09 Mar, 2020
Compass-IGSO7Inclined Geosynchronous Orbit (IGSO)09 Feb, 2020
BeiDou-3 M19Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M20Medium Earth Orbit (MEO)16 Dec, 2019
BeiDou-3 M21Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 M22Medium Earth Orbit (MEO)23 Nov, 2019
BeiDou-3 I3Inclined Geosynchronous Orbit (IGSO)04 Nov, 2019
BeiDou-3 M23Medium Earth Orbit (MEO)22 Sep, 2019
BeiDou-3 M24Medium Earth Orbit (MEO)22 Sep, 2019

galileo

Satellite NameOrbit Date
GSAT0223MEO - Near-Circular05 Dec, 2021
GSAT0224MEO - Near-Circular05 Dec, 2021
GSAT0219MEO - Near-Circular25 Jul, 2018
GSAT0220MEO - Near-Circular25 Jul, 2018
GSAT0221MEO - Near-Circular25 Jul, 2018
GSAT0222MEO - Near-Circular25 Jul, 2018
GSAT0215MEO - Near-Circular12 Dec, 2017
GSAT0216MEO - Near-Circular12 Dec, 2017
GSAT0217MEO - Near-Circular12 Dec, 2017
GSAT0218MEO - Near-Circular12 Dec, 2017

glonass

Satellite NameOrbit Date
Kosmos 2569--07 Aug, 2023
Kosmos 2564--28 Nov, 2022
Kosmos 2559--10 Oct, 2022
Kosmos 2557--07 Jul, 2022
Kosmos 2547--25 Oct, 2020
Kosmos 2545--16 Mar, 2020
Kosmos 2544--11 Dec, 2019
Kosmos 2534--27 May, 2019
Kosmos 2529--03 Nov, 2018
Kosmos 2527--16 Jun, 2018

gps

Satellite NameOrbit Date
Navstar 82Medium Earth Orbit19 Jan, 2023
Navstar 81Medium Earth Orbit17 Jun, 2021
Navstar 78Medium Earth Orbit22 Aug, 2019
Navstar 77Medium Earth Orbit23 Dec, 2018
Navstar 76Medium Earth Orbit05 Feb, 2016
Navstar 75Medium Earth Orbit31 Oct, 2015
Navstar 74Medium Earth Orbit15 Jul, 2015
Navstar 73Medium Earth Orbit25 Mar, 2015
Navstar 72Medium Earth Orbit29 Oct, 2014
Navstar 71Medium Earth Orbit02 Aug, 2014

irnss

Satellite NameOrbit Date
NVS-01Geostationary Orbit (GEO)29 May, 2023
IRNSS-1IInclined Geosynchronous Orbit (IGSO)12 Apr, 2018
IRNSS-1HSub Geosynchronous Transfer Orbit (Sub-GTO)31 Aug, 2017
IRNSS-1GGeostationary Orbit (GEO)28 Apr, 2016
IRNSS-1FGeostationary Orbit (GEO)10 Mar, 2016
IRNSS-1EGeosynchronous Orbit (IGSO)20 Jan, 2016
IRNSS-1DInclined Geosynchronous Orbit (IGSO)28 Mar, 2015
IRNSS-1CGeostationary Orbit (GEO)16 Oct, 2014
IRNSS-1BInclined Geosynchronous Orbit (IGSO)04 Apr, 2014
IRNSS-1AInclined Geosynchronous Orbit (IGSO)01 Jul, 2013
Advertisement